DDOT Presents Options To Extend Met Branch Trail

Met Branch Trail Brookand NE Washington DCBack in 2012 we wrote about frustrations with delays in  completing the Met Branch Trail, specifically,  connecting the portions that run along the Brookland/CUA Metro with Silver Spring as originally planned. We were excited to learn that DDOT recently hosted a presentation of preliminary designs for the MBT’s remaining sections in DC. For more information, check out this super-detailed story from WashCycle, a cycling advocacy blog. Construction is planned for 2017.

Leave a Reply

Your email address will not be published. Required fields are marked *